The CSI Form 13.1A is designed for use during the post-bidding or negotiating phases of a project, allowing for the submission of substitution requests. This form facilitates the process by which contractors propose alternatives to materials or products initially specified in the project documents. Interested parties are encouraged to accurately and comprehensively fill out the form, ensuring all required comparative data and supporting documents are attached to support their substitution request.

For those ready to submit a substitution request, please ensure your proposal includes detailed comparisons and justifications for the suggested alternative. Click the button below to proceed with filling out the CSI Form 13.1A.

Prepare Document Here
Content Overview

Navigating the complexities of construction projects often involves adapting to unexpected changes or sourcing alternatives to initially specified materials or products. The CSI Form 13.1A plays a crucial role in this process, allowing for substitution requests to be formally proposed after the bidding or negotiating phase of a project. This document, originating from the Construction Specifications Institute, serves as a standardized template to ensure all necessary details are communicated clearly and efficiently between parties involved. The form covers a wide range of information, including the project details, specific identification of the item to be substituted, reasons for the substitution, and any potential impact on the project scope, timeline, and budget. It requires a thorough comparison between the original product and the proposed substitute, including manufacturer details, performance data, and the history of the product's use in similar contexts. Additionally, the form prompts the requestor to indicate whether the substitution could affect other parts of the work and provides space to document possible cost savings. The inclusion of supporting data such as drawings, product data, and tests, further enriches the substitution proposal, facilitating informed decision-making. Designed to promote transparency and accountability, the CSI Form 13.1A exemplifies the industry's commitment to maintaining the integrity and quality of construction projects amidst changes.

Example - Csi 13 1A Form

SUBSTITUTION

REQUEST

(After the Bidding/Negotiating Phase)

Project:

 

Substitution Request Number:

 

 

 

 

From:

 

To:

 

Date:

 

 

 

 

A/E Project Number:

 

Re:

 

Contract For:

 

 

 

 

 

 

 

 

Specification Title:

 

 

 

 

 

Description:

 

Section:

Page:

Article/Paragraph:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Proposed Substitution:

 

 

 

 

 

 

 

 

 

 

 

 

Manufacturer:

 

 

 

Address:

 

 

 

Phone:

 

 

Trade Name:

 

 

 

 

 

 

 

 

Model No.:

 

 

Installer:

 

 

Address:

 

 

Phone:

 

History: ☐ New product

1-4 years old ☐ 5-10 years old

☐ More than 10 years old

 

Differences between proposed substitution and specified product:

Point-by-point comparative data attached — REQUIRED BY A/E

Reason for not providing specified item:

Similar Installation:

 

 

 

 

 

Project:

 

 

 

Architect:

 

Address:

 

 

 

Owner:

 

 

 

 

 

 

Date Installed:

 

Proposed substitution affects other parts of Work:

☐ No

☐ Yes; explain

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Savings to Owner for accepting substitution:

 

 

 

 

 

($

 

).

 

 

 

 

 

 

 

 

 

 

 

 

Proposed substitution changes Contract Time:

☐ No

☐ Yes [Add]

[Deduct]

 

 

 

 

 

days.

 

 

 

 

 

 

 

 

 

 

 

 

Supporting Data Attached: ☐Drawings

☐Product Data

☐ Samples

☐ Tests

☐ Reports

 

 

 

 

 

 

 

 

 

 

 

 

© Copyright 2013, CSI,

Page ___ of ___

Form Version: September 2013

110 S. Union St., Suite 100, Alexandria, VA 22314

 

CSI Form 13.1A

Form Data

Fact Name Description
Purpose of the Form Used for requesting a substitution of materials, products, or equipment after the bidding or negotiating phase of a project.
Contents of Form Includes details such as Project and A/E Project Numbers, specification titles, description of the proposed substitution including manufacturer, and comparative data between proposed and specified products.
Decision Criteria Requires attachment of point-by-point comparative data, reasons for not providing the specified item, and details on how the substitution affects the project including costs and time.
Governing Law(s) This form does not specify particular governing law(s) as it may be used in various jurisdictions. Users should consult local laws and regulations that might affect the use of such a form in a specific state or municipality.

How to Fill Out Csi 13 1A

Filling out the CSI Form 13-1A is a key step for professionals seeking a substitution for specified materials or products after the bidding or negotiating phase of a project. This document lays out the framework for proposing an alternative, detailing the reasons behind the change and any potential impact on the project. It's essential for maintaining transparency and alignment with project goals, while ensuring all parties are informed about the changes and their implications. The process requires careful attention to detail to clearly communicate the necessity and benefits of the proposed substitution.

  1. Begin by entering the specific details of the project at the top of the CSI 13-1A form, including the Project name, Substitution Request Number, and the dates of communication.
  2. Insert the contact details of the entity requesting the substitution, including the From and To sections for proper identification of all parties involved.
  3. Provide the A/E Project Number to ensure the request is properly linked to the right architectural/engineering project file.
  4. Specify the Contract For with the title of the specification being substituted and include a detailed Description of the proposed product or material.
  5. Clearly identify the Section, Page, and Article/Paragraph in the specifications that the proposed substitution will alter.
  6. For the proposed substitution, detail the Manufacturer, Address, Phone, Trade Name, and Model No., as well as the proposed Installer's contact information.
  7. Check the appropriate box to indicate the History of the proposed product, whether it is a new product or has been used for specific years. This information is crucial for evaluating the reliability of the substitution.
  8. Attach a comparative analysis highlighting the Differences between the proposed substitution and the specified product, noting that point-by-point comparative data is required.
  9. Explain the Reason for not providing the specified item, ensuring to include any logistical, financial, or performance-based justifications.
  10. Detail any similar installations of the proposed product, including the Project, Architect, Address, and Owner, to showcase precedent and give confidence in the substitution.
  11. If the proposed substitution affects other parts of the work, mark the corresponding box and provide an explanation of the impact.
  12. Calculate the potential Savings to Owner for accepting the substitution and specify if the change will alter the contract time by adding or deducting days.
  13. Check the boxes to indicate which types of Supporting Data are attached, such as Drawings, Product Data, Samples, Tests, and Reports, to provide comprehensive information for the review process.

Once the form is filled out, it acts as an official request for consideration of a substitution in a project's specified materials or products. This document, supported by detailed comparisons, reasons for the change, and potential impacts, aids in making informed decisions that align with the project's goals, budget, and timeline. It's the starting point for discussions and approval processes necessary to implement changes smoothly and efficiently, ensuring all stakeholders are well-informed and on board with the modifications.

FAQ

What is the CSI 13.1A form used for?

The CSI 13.1A form is used for submitting a substitution request after the bidding or negotiating phase of a construction project. It enables contractors or subcontractors to propose alternatives to materials, products, or equipment specified in the original contract documents. This form ensures that any proposed substitutions are documented, evaluated, and approved by the project's architect/engineer (A/E) before being implemented.

How do I correctly fill out the substitution request on the CSI 13.1A form?

To properly complete the CSI 13.1A form, you must provide detailed information about the proposed substitution. This includes the project name, request number, the A/E project number, a detailed description of the proposed substitution (including manufacturer, model number, and installer details), and a comparative analysis of the proposed product versus the original specification. Additionally, you must include the reason for the substitution, any potential impact on other parts of the work, and the expected savings to the owner. Supporting data, such as drawings, product data, tests, and sample reports, should also be attached.

What do I need to include in the 'History' section of the CSI 13.1A form?

In the 'History' section, you must indicate the age of the proposed product by selecting one of the given options: new product, 1-4 years old, 5-10 years old, or more than 10 years old. This information helps in assessing the reliability and performance history of the proposed substitution.

Is it mandatory to provide comparative data for the proposed substitution on the CSI 13.1A form?

Yes, providing point-by-point comparative data for the proposed substitution as opposed to the specified product is required. This comparative analysis must cover all relevant details and be attached to the form. It is a critical component that helps the A/E evaluate the suitability and compatibility of the proposed substitution.

What should I do if the proposed substitution affects other parts of the work?

If the proposed substitution impacts other parts of the work, indicate this by selecting 'Yes' in the appropriate section and provide a detailed explanation of the effects. This may include alterations to related systems, installation sequences, or compatibility issues, and is essential for a comprehensive evaluation of the proposed substitution.

How is information about savings to the owner due to the substitution handled in the CSI 13.1A form?

The CSI 13.1A form requires you to specify any cost savings to the owner if the proposed substitution is accepted. You must enter the dollar amount of the savings. This information is crucial for the owner's decision-making process, as cost efficiency is often a key factor in approving substitutions.

Do I need to mention how the proposed substitution will change the contract time?

Yes, it is important to indicate whether the proposed substitution will alter the project's timeline by either adding or deducting days from the contract time. This information helps in assessing the substitution’s impact on the project schedule and its feasibility.

What constitutes 'Supporting Data' for a CSI 13.1A form submission?

Supporting data for a CSI 13.1A form submission can include drawings that detail the installation and specifications of the proposed substitution, product data sheets, samples of the material or product, test results demonstrating compliance with industry standards, and reports assessing the product's performance. Attaching relevant supporting data ensures the A/E has all necessary information to evaluate the proposed substitution thoroughly.

Common mistakes

Filling out the CSI Form 13.1A, or the Substitution Request, is a critical task that requires attention to detail and careful consideration of its implications on a construction project. However, people often make mistakes when completing this form, which can lead to delays, misunderstandings, or even the rejection of the substitution request. Here are common errors to avoid:

  1. Not providing a complete and accurate project description, including the substitution request number, which is crucial for tracking and reference purposes.

  2. Failing to include the exact specification title, section, page, and article/paragraph number that the proposed substitution will replace. This omission can cause confusion and delays in processing the request.

  3. Omitting point-by-point comparative data between the specified and proposed products. This information is essential for the architect/engineer (A/E) to evaluate the suitability of the substitution.

  4. Incomplete information about the proposed substitution's manufacturer, model number, and installer, including their contact details. This is vital for verification and approval purposes.

  5. Incorrectly assessing or stating the history of the product's use (e.g., new product, 1-4 years old, etc.). This affects the decision-making regarding the product’s reliability and suitability.

  6. Not clearly stating the reason for the substitution and not providing a sufficient explanation for why the specified item cannot be provided. This rationale is critical for understanding the necessity of the request.

  7. Forgetting to mention whether the proposed substitution affects other parts of the work, which could lead to additional changes or adjustments in the project.

  8. Overlooking the potential savings to the owner or inaccurately calculating them. Clearly demonstrating cost savings can be a persuasive factor in the approval process.

  9. Failure to specify whether the proposed substitution changes the contract time, including any potential addition or deduction of days. Accurate schedules are crucial for project planning.

  10. Not attaching supporting data such as drawings, product data, samples, tests, or reports that are necessary for a thorough evaluation of the proposed substitution.

By avoiding these common mistakes, individuals can improve the clarity and quality of their substitution requests, facilitating a smoother approval process and contributing to the successful execution of projects. Remember, the key to filling out the CSI Form 13.1A effectively lies in providing as much relevant and accurate information as possible.

Documents used along the form

When working on construction projects, the Substitution Request Form (often referred to as the CSI 13 1A form) serves as a critical document for proposing changes to the initially specified materials or products. However, to ensure a thorough review and seamless integration of these proposed substitutions, several other documents are typically required. Each of these plays a unique role in supporting the request and providing comprehensive information for decision-making. Below is a list of such documents that usually accompany the CSI 13 1A form in the construction documentation process.

  • Product Data Sheets: These provide detailed information about the characteristics, performance, and installation requirements of the proposed substitution. They're essential for understanding how the new product compares to the original specification.
  • Performance Comparisons: This document offers a direct comparison between the proposed substitution and the specified product, covering aspects such as durability, efficiency, and sustainability. It helps in evaluating whether the alternative meets or exceeds the requirements of the project.
  • Cost Analysis: A breakdown of the cost differences between the original product and the proposed substitution. It may also include potential long-term savings, thereby justifying the substitution from a financial standpoint.
  • Sample Approval Form: If a physical sample of the proposed substitution is provided, this form records its acceptance or rejection based on a visual and possibly functional examination. It's crucial for ensuring that the material meets the project's aesthetic and quality standards.
  • Manufacturer's Installation Instructions: For ensuring that the product can be installed correctly within the project's parameters, these instructions outline the necessary steps, tools, and precautions. They help in assessing the feasibility and potential impact on the project timeline.
  • Warranty Information: This outlines the guarantee provided by the manufacturer concerning the product's performance and quality over time. Including warranty information is vital for understanding the long-term implications of the substitution on maintenance and operations.

Together, these documents provide a holistic view of the proposed substitution's implications on the construction project. They assist all parties involved—architects, engineers, construction managers, and owners—in making informed decisions that align with the project's goals, budget, and timeline. Ensuring these documents are complete and detailed enhances the efficiency and effectiveness of the substitution review process.

Similar forms

  • Change Order Request Forms: These forms, commonly used in the construction and contracting sectors, are similar to the CSI 13 1A form in that they are used after the initial contracting phase to document and request changes or substitutions to the agreed-upon work scope. Both documents serve the purpose of officially documenting variations from the original plan, and they require detailed information about the proposed change, including a description, justification, and details on how it affects the overall project schedule and budget.

  • Material Approval Submittal Forms: These documents are designed to procure formal approval for materials proposed to be used in construction projects. Like the CSI 13 1A form, they necessitate comprehensive information about the materials such as manufacturer details, trade names, and model numbers. Both types of forms are crucial for ensuring that the materials and products used meet the project's requirements and specifications.

  • Request for Information (RFI): An RFI is a document used in construction and engineering to clarify details about design documents, drawings, specifications, and contract clauses. While RFIs are more focused on requesting information than making a substitution, they share a common purpose with the CSI 13 1A form in terms of addressing ambiguities and ensuring clarity about project specifications to prevent delays and additional costs.

  • Product Data Sheets: These sheets provide comprehensive details about a product's characteristics, such as its physical dimensions, performance criteria, and applicable standards. When a contractor or project manager submits a CSI 13 1A form for a proposed substitution, they often attach product data sheets to support their request. Both documents collectively help decision-makers evaluate whether the alternative product meets the project's specifications and quality requirements.

  • Variation Orders: Variation orders are formal requests issued for changing the scope of work in a construction contract. They are akin to the CSI 13 1A form as both detail adjustments to initially agreed terms, including but not limited to, changes in materials, designs, and work schedules. Key to both documents is their role in officially documenting adjustments that have budgetary and timeline implications on the project.

Dos and Don'ts

When filling out the CSI Form 13.1A, a Substitution Request after the Bidding/Negotiating Phase, there are critical dos and don'ts that can significantly affect the outcome of your request. Being meticulous and thoughtful throughout this process ensures clear communication and maximizes the chances of your substitution getting approved.

Things You Should Do:

  • Provide complete information: Ensure all fields are accurately filled out, including project details, substitution request number, and all relevant sections about the proposed substitution.
  • Attach comparative data: It's imperative to attach a point-by-point comparison between the proposed substitution and the specified product. This detailed analysis is crucial for the Architect/Engineer (A/E) to evaluate the request properly.
  • Explain the reason for substitution: Clearly articulate why the specified item cannot be provided. Whether due to availability issues, cost factors, or superior performance of the proposed product, ensure your reasoning is well-documented.
  • Discuss the impact on the project: Whether the proposed substitution affects other parts of the work or the contract time, provide a detailed explanation. If there are savings to the owner, quantify these in your submission.
  • Include supporting data: Attach all necessary supporting documents such as drawings, product data, samples, tests, and reports. This comprehensive approach helps in facilitating a faster review process.
  • Check the history box appropriately: Indicate whether the product is new, 1-4 years old, 5-10 years old, or more than 10 years old. This information can be vital for assessing product reliability and performance history.

Things You Shouldn't Do:

  • Skip sections: Avoid leaving any section incomplete. Missing information can lead to delays or even the rejection of the substitution request.
  • Forget to sign and date the form: An unsigned or undated form may not be processed, as these are essential for validating the request.
  • Omit point-by-point comparative data: This is a common mistake that can significantly weaken your proposal. Comparative data is a mandatory requirement that should not be overlooked.
  • Assume acceptance without official approval: Do not proceed with the substitution until formal approval has been received. Acting prematurely can result in conflicts and additional costs.
  • Be vague about the impact on the project: General statements about the substitution affecting the project or contract time will not suffice. Specific details and explanations are necessary for a fair assessment.
  • Submit outdated or irrelevant supporting documents: Ensure that all attached documents are current, relevant, and directly support the proposed substitution. Irrelevant or outdated information can hinder the review process.

In conclusion, the key to a successful CSI Form 13.1A submission lies in thoroughness, clarity, and adherence to the specified requirements. By carefully following the dos and avoiding the don'ts, you can streamline the review process and improve your chances of acceptance.

Misconceptions

Understanding the CSI 13.1A Form: Dispelling Common Misconceptions

The CSI 13.1A form, known as the Substitution Request form, is an essential document in construction projects. It serves a critical role during the post-bidding or negotiating phase when a contractor seeks approval for a substitute material or product. Despite its significance, several misconceptions surround its use and requirements. Let's clarify some of the common misunderstandings.

  • It's only about finding cheaper options: One of the most common misconceptions is that the CSI 13.1A form is used solely to find less expensive alternatives to the specified products. While cost savings can be a benefit, the form's primary purpose is to propose substitutes that meet or exceed the performance of the original specifications, which might be due to availability issues, time constraints, or improved technology.

  • Any substitute can be proposed: Another misunderstanding is that any alternative product can be proposed using this form. In reality, the proposed substitution must be accompanied by detailed comparative data and a thorough explanation of why it is being proposed. This includes understanding how it will integrate with other components of the project, any potential impact on the project timeline, and its overall suitability for the specified requirement.

  • Approval is guaranteed: Submitting a CSI 13.1A form does not ensure approval. The architect or engineer of record (A/E) meticulously reviews each submission against several criteria, including compatibility with the overall design, compliance with codes and standards, and impact on the project's schedule and budget. The decision to approve a substitution request involves careful consideration and is not automatic.

  • It's a complex and technical document: While the CSI 13.1A form requires specific information, the misconception that it is overly complex and approachable only by experts is not accurate. With a clear understanding of the project requirements and the proposed substitution, professionals can fill out this form comprehensively. It’s designed to be thorough yet accessible.

  • Only major product changes require a CSI 13.1A form: Some might believe that minor changes or alternatives do not necessitate filling out and submitting a CSI 13.1A form. However, the truth is that any change from the specified materials or methods, no matter how small it seems, should be documented through this form. This ensures all parties are informed and agree on the substitution, maintaining the integrity and objectives of the original project plan.

Dispelling these misconceptions can lead to a smoother project flow, ensuring materials and products are used in the best possible manner. Understanding the purpose, requirements, and process of the CSI 13.1A form is crucial for anyone involved in a construction project, facilitating better communication and decisions throughout the course of construction.

Key takeaways

Completing the CSI Form 13.1A, also known as the Substitution Request form, after the bidding or negotiating phase of a construction project, involves several crucial elements that applicants should meticulously address to facilitate a smooth approval process. This detailed consideration ensures that the proposed substitution does not jeopardize the integrity, cost-efficiency, or timeline of the project. Here are nine key takeaways:

  • Accurate Project Identification: Clearly specifying the project's name and associated details ensures that the substitution request is accurately linked to the correct construction effort.
  • Comprehensive Product Description: Providing a detailed description, including the manufacturer, trade name, and model number, helps in evaluating the suitability of the proposed substitution.
  • Substitution Justification: A clear explanation of why the specified item cannot be provided and the advantage of the proposed alternative aids in the assessment process.
  • Attached Supporting Documents: Attaching point-by-point comparative data, drawings, product data, samples, tests, and reports as required offers a concrete basis for evaluating the proposed substitution.
  • Impact on Other Work Sections: Identifying whether the substitution will affect other parts of the work is critical for maintaining project coherence and integrity.
  • Cost Implications: Articulating the financial impact, including any savings for the owner, is crucial for budgetary considerations.
  • Timeframe Adjustments: Indicating whether the proposed substitution will alter the project timeline assists in scheduling and planning.
  • History and Similar Installations: Providing a history of the product and examples of similar installations offers proof of performance and reliability.
  • Contact Information: Including comprehensive contact information for both the installer and the manufacturer ensures that any follow-up questions or concerns can be quickly addressed.

Adherence to these points not only expedites the consideration process but also minimizes potential disruptions, ensuring that the project proceeds efficiently and effectively. The key is to provide thorough, accurate information that reflects thoughtful consideration of the proposed substitution's impact on the project at large. This attention to detail underscores the importance of the substitution request in maintaining or enhancing the project’s overall objectives.